Ratchaburi:
Yanada Gas Pipeline Project

Disziplinen

  • Oil & Gas

Gesellschaften

Dorsch Consult asia Co., Ltd.

Bausumme

approx. US$ 280 million

Mitarbeiterzahl

9

Auftraggeber

PTT Public Company Limited, Thailand

Dauer

Von 1996 bis 1998

Projektleistungen

DORSCH CONSULT has been awarded a subcontract involving the planning, detailed design, tendering, procurement and supervision of mechanical-electrical, instrumentation and telecommunications system for the main Operations and Maintenance Center, various intermediate stations(such as the take-over and block valve station at Ban I Tong) and associated facilities (such as main workshop and warehouse, office, power station, gate house and fire-fighting garage, control building, restaurant and housing).

The trades involved in each case are mechanical electrical, instrumentation and telecommunications

Kontakt

Dorsch Consult asia Co., Ltd.

Bangkok (Headquarters)
1168/45 Lumpini Tower,
18th Floor
Rama 4 Road
Tungmahamek, Sathon

10120 Bangkok
Thailand

Tel.: +66 2 - 679 89 00
Fax: +66 2 - 679 89 95
E-Mail: dcasia@dorsch.co.th

Karte

Beschreibung

The Yadana Gas Pipeline Project consists of a pipeline, some 355 kilometers in length, bringing natural gas from the Yadana Gas Field in the Andaman Sea offshore from Myanmar to Ratchaburi in Thailand.

The portion of the project within Thailand form the Myanmar border to the Ratchaburi Terminal extends some 260 kilometers, partly through difficult mountainous terrain.

The estimated final capacity of the 42” gas pipeline is some 525 million cubic feet per day.