Burghausen (upper bavaria):
Railway overpass Alzkanal Burghausen

Disciplines

  • Railways
  • Tunnels & Bridges

Companies

GRE German Rail Engineering GmbH

Client

WiföG Burghausen / RegioInvest Inn-Salzach GmbH

Duration

From 2010 to 2014

Project Activities

Project planning Part VII, Lph 1-7 § 55 HOAI (2009) and structural planning Part VIII, Lph 2-6 § 64 HOAI (2009) for engineering structures.

Coordination with Wacker Chemie and the Alzwerke regarding operational influences during the construction period and coordination of the measures for the relocation of the divisions.

Contact

GRE German Rail Engineering GmbH

Frankfurt (Headquarters)
Frankfurt Airport Center 1
Hugo-Eckener-Ring

D-60549 Frankfurt am Main
Deutschland

Phone: +49 30 24749-0
E-Mail: info@gre-rail.com

View in maps

Description

The consortium between GRE - Gauff Rail Engineering GmbH & Co. KG and JBG - H.P. Gauff Ingenieure was commissioned by WiföG in 2010 with the overall planning for the new construction of the railway overpass for the access track to the transhipment terminal.

The subject of the project is the construction of a transhipment terminal for combined transport in Burghausen. The planned facility is a technical and operational interface between road and rail transport with the aim of transferring long-distance goods transport from road to rail using standardised loading units.

Due to the routing of the siding to the terminal, the Alz Canal has to be crossed with a pronounced bridge incline. Further constraints are the upper edge of the rails to be stopped and the lower edge of the neighbouring bridges.

A deep-founded frame structure in reinforced concrete construction is planned for the crossing of the tracks. Due to the low construction height, a solid roadway is absolutely necessary on the structure.

Dimensions:

Clear width: 19.5 m

Clear height: > 0.40 m above water level

Length: approx. 26.5 m

Total width: 7.1 m

Angle of crossing: 68.9 gon