Iraq (nationwide):Hajama-Sawa Railway - Geotechnics
Disciplines
- Railways
- Tunnels & Bridges
- Environment & Sustainability
Companies
Dorsch International Consultants
Client
Iraqi Republic Railways IRR
Duration
From 2008 to 2009Project Activities
- Screening and analysis of the available documents (soil profiles, geotechnical reports, literature, geological maps)
- Geotechnical report with foundation expertise for track, bridges, embankments. Inter alia recommendations for the minimum distance of the new track at bridges which is necessary to prevent any interaction with the pile foundation of the existing bridges (such as one-sided settlements) and recommendations for the filling of the new embankments onto the shoulder of the existing embankments.
- Sources for construction material
Contact
Dorsch International Consultants GmbH
München (Headquarters)
80687 München
Germany
Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de
Description
The railway between Hajama and Sawa (ca. 17 km) is a section of the existing single track railway line from Baghdad to Basra and its harbour.
Iraqi Republic Railways (IRR) intends to upgrade the line between Hajama and Sawa with a second track parallel and as close as possible to the existing track. Along this stretch the railway is crossing the Euphrates River and two of its branches on three major bridges as well as three local roads on single superstructure bridges.
The section is located in the Mesopotamian Delta Plain. The upper tens of meters of the subsoil are built up of alluvial fine grained and compressible deposits. The groundwater table is close to the surface.
Almost the entire section of the existing railway runs on embankments with heights up to 11 m. The embankments will be widened on one side for the new track.