Berlin:Planning and management of the construction of the first running water heat pump in Berlin
Disciplines
- Energy Infrastructure
- Power & Electrical
Companies
BLS Energieplan GmbH
Client
BTB Berlin
Duration
From 2019 to 2022Project Activities
- Feasibility study for technical concept and eligibility
- System conception to detail engineering
- Integration technology into existing infrastructure
- Commissioning and tendering
- Construction management
Contact
BLS Energieplan GmbH
Berlin (Headquarters)
EUREF-Campus 12
D-10829 Berlin
Deutschland
D-10829 Berlin
Deutschland
Phone: +49 30 533281-0
E-Mail: info@bls-energieplan.de
Description
The plan is to engineer a flow heat pump combined with a CHP to participate in the iKWK subsidy program. It is an element of a larger district heating system of 250 MW thermal. It is embedded in the support mechanism for innovative CHP solutions. It is part of a decarbonization strategy of the district heating network in general and of a carbon-fired site in particular.
Outcome:
- River heat pump 2 x 3.5 MW
- Cogeneration 4 x 4.5 MW
- Commissioning planned for winter 2022 heating season