Frankfurt/Main Airport:
Alteration of Office Including Upgrading of Fire Protection (Building 200, Hall C, E2)

Disziplinen

  • Hochbau & Architektur
  • Transportation

Gesellschaften

Dorsch International Consultants

Auftraggeber

Fraport AG

Dauer

Von 2001 bis 2005

Projektleistungen

  • Concept Design
  • Approval Design
  • Final Design
  • Preparation of Award
  • Participation in Award
  • Project Supervision

Kontakt

Dorsch International Consultants GmbH

München (Headquarters)
Landsberger Str. 368
80687 München
Germany

Tel.: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de

Karte

Beschreibung

Design task is the alteration of former office areas to a travel agency of Fraport AG, the airport operator, and the new design of a luggage deposit and the installation of a HC-elevator.

The total project implementation will be accomplished in individual building phases in close dependence to operational and functional processes.Design and implementation of the project is characterized by requirements of building fire protection and the implementation of clear and transparent architecture.

Design is based upon § 53 HBO ”Special Use Building Systems and Rooms”.