Rayong:IRPC – Natural Gas Pipeline Project
Disziplinen
- Oil & Gas
Gesellschaften
Dorsch Consult asia Co., Ltd.
Auftraggeber
PTT
Dauer
Von 2009 bis 2011Projektleistungen
Project management, Construction Supervision, from data collection, initial designs, surveys, through detail engineering, construction management and commissioning through 12 months warrantee period. Activities will include the following:
- Overall project management
- Project planning and implementation
- Project control
- Review and approve contractor's detail engineering, construction plans,
- procedures and drawings
- Risk Management
- Contract administration.
- Manpower allocation.
- Supplier quality, expediting and shop inspection
- Construction supervision.
Kontakt
Dorsch Consult asia Co., Ltd.
Bangkok (Headquarters)
18th Floor
Rama 4 Road
Tungmahamek, Sathon
10120 Bangkok
Thailand
Tel.: +66 2 - 679 89 00
Fax: +66 2 - 679 89 95
E-Mail: dcasia@dorsch.co.th
Beschreibung
The IRPC Natural Gas Pipeline is a 25 km high pressurized pipeline system with the project purpose to expand the utilization of Third Transmission Pipeline for IRPC facilities at Rayong to feed in to the IRPC Combined Cycle Powerplant.
The pipeline will originate from the existing Third Transmission Pipeline to IRPC Industrial Complex and Combined Heat Power Plants.
The IRPC Natural Gas Pipeline Project had to be built under various sensitive concerns such as government, authorities, process, environmental matters, traffic, landowner issues, etc.