Banja Luka:Urban Water Supply and Sewerage System, Banja Luka
Disziplinen
- Wasserbau
Gesellschaften
Dorsch International Consultants
Auftraggeber
Municipality of Banja Luka
Dauer
Von 2010 bis 2016Projektleistungen
The project comprised four main phases:
- Preparation of Final Design and Tender Documents
- Assistance to the Client in Tendering and Contracting
- Site Supervision of Works
- Assistance to the Client during the Defects Liability Period
Kontakt
Dorsch International Consultants GmbH
München (Headquarters)
Landsberger Str. 368
80687 München
Germany
80687 München
Germany
Tel.: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de
Beschreibung
At the time of the project, Banja Luka had population of 230,000, and the water supply situation was critical due to high water losses and faecal contamination of River Vrba, the main water source.
The project focused on improving the reliability and sustainability of the water supply and sanitation services in Banja Luka and thus improving living conditions, raising public health standards and facilitating economic growth. The Main project objectives were:
- Improving of the water quality of the river Vrbas upstream of the raw water treatment plant
- Ensuring universal, equitable and affordable supply and reducing technical water losses in the town district Caire which in turn reduced energy consumption and ultimately contributed to combatting climate change
- Connecting the town district Tunijce to the public water system
- Implementing a sewerage system for Karanovac